# STS and Seamless Transfer: How to Achieve Near-Invisible Switching

Built-in STS &lt;10ms, standalone module &lt;20ms. How STS works, transfer timing, sizing advice and when STS is mandatory.

Switching time: loads barely notice

Built-in STS <10ms; standalone module <20ms (per BOM). STS provides "supply continuity" — it does not generate power.

Three energy-flow states and transfer timing

**① Grid-tied (GFL, PQ)**: grid via ATS supplies; PV/battery self-consume/arbitrage per EMS; surplus to grid.

**② Grid loss (STS transfer)**: STS/ATS switch fast; system isolates from grid; critical loads stay powered.

**③ Off-grid, low SOC (diesel)**: grid-forming PCS holds reference; diesel via ATS; exit when recovered.

Sizing advice

Not every load needs seamless transfer — confirm "how long an outage is acceptable" before specifying STS. VGRID [STS200/400/600](/en/product/sts200-400-600) is a 200–600kW fast transfer module with Local EMS and RS485/Modbus TCP/CAN/4G; many [PCS](/en/product/sp125hcps) and all-in-ones offer built-in STS versions.

## How do STS and ATS divide work?

STS does millisecond grid/off-grid transfer for critical loads; ATS switches grid↔diesel and interlocks.

## Which loads must have STS?

Outage-sensitive loads (data centres, precision manufacturing, medical, comms) should; ordinary loads can relax by allowed interruption time.

## Built-in vs standalone STS?

Small/mid single units often use built-in STS; large systems or multi-path transfer use standalone modules (e.g. 600kW) for flexibility.

## How does diesel coordinate during transfer?

Grid loss → STS off-grid; low SOC → EMS auto-starts diesel; recovered → exit; EMS owns start/stop.